LIST OF WORKS UNDER 2-DAMPA (ST) A/C FROM 2019 – 2020 

Sl. No Name of works  Sanction Amount  Executing  Agency Status
1 Purcharse of Morque Van for public utility    1,007,840 MLA, 2-Dampa Completed
2 Construction of Urinal shed ladies and gens at Ailawng       200,000 GSA, Ailawng Completed
3 Purcharse of Silpaulin for public utility       505,000 MLA, 2-Dampa Completed
4 120 Long benches and Tables for centenary H/S at W.Phaileng Dnthar       150,000 VC, New W.Phaileng Completed
5 Construction of Library cum Information centre at New W.Phaileng       500,000 VC, New W.Phaileng Completed
6 Construction of Volleyball Court near Chhippui, H/S       200,000 YMA, Chhippui Br. Completed
7 Construction of approach road from Lallen to Phuldungsei       240,000 VC, Lallen Completed
8 Construction of Volleyball Court at W.Phulpui       250,000 VC, W.Phulpui Completed
9 Construction of Mid-Day Meal kitchen shed at Hruiduk P/S       150,000 VC, Hruiduk Completed
10 Construction of PCC flooring at Thlersei road at Reiek       500,000 MZP, Sub-Hqrs. Reiek Completed
11 Construction of Community Hall at Lungphun       500,000 VC, Lungphun Completed
12 PCC flooring BNRGSK road at Hreichuk       400,000 YMA, Hreichuk Completed
13 PCC flooring from Lalchawimawia house to PWD, IB at W.Lungdar       450,000 VC, W.Lungdar Completed
14 PCC flooring from K.Lalrinmawii house to Presbyterian Churh at Ailawng       350,000 YMA, Ailawng Completed
15 Construction of Retaining wall near Presbyterian Church at Rupuihlim       150,000 VC, Rulpuihlim Completed
16 Construction of Public Urinal Shed near Presbyterian Pastor Quarter at Darlung       150,000 YMA, Darlung Completed
17 Construction of PCC flooring from Nghakliana House to IKK Church at Bawngthah       200,000 VC, Bawngthah Completed
18 Purchase of Shawls for Old Age persons       577,500 MLA, 2-Dampa Completed
19 Purchase of sports goods        438,518 MLA, 2-Dampa Completed
20 Construction of MHIP House at W.Phaileng       200,000 VC, W.Phaileng Completed
21 Construction of Internal road (PCC) at Lallen       500,000 VC, Lallen Completed
22 Construction of PCC flooring and Urinal shed at W.Phaileng       200,000 VC, W.Phaileng Completed
23 Renovations of Tuikhur at W.Phaileng         50,000 VC, W.Phaileng Completed
24 Construction of Library cum Information centre at New W.Phaileng       500,000 VC, New W.Phaileng Completed
25 Construction of BNRGSK approach road at Hreichuk       500,000 VC, Hreichuk Completed
26 Construction of Water supply pipe at Reiek         50,000 Principal, RHSS, Reiek Completed
27 Construction of Public Playground at Zopui         50,000 YMA, Zopui Br. 2nd Instalment not yet release
28 Purchase of Parachute (45 nos)       170,100 MLA, 2-Dampa Completed
29 Construction of MHIP House at Pukzing       200,000 VC, Pukzing Completed
30 Construction of Waiting shed at Tuahzawl       150,000 VC, Tuahzawl Completed
31 Extension of UPS Classroom at Hruiduk         50,000 VC, Hruiduk Completed
32 Construction of Primary School approach step at Hruiduk       100,000 VC, Hruiduk Completed
33 Construction of Waiting shed at Darlung       200,000 VC, Darlung Completed
34 Renovation of Community Hall at Saithah       200,000 VC, Saithah Completed
35 Construction of PCC flooring at Kanghmun Godown to PWD Quarter       500,000 VC, Kanghmun Completed
36 Construction of Cement Tuikhur and Tuithang Tuikhur at Kawnmawi       100,000 YMA, Kawnmawi Completed
37 Construction of Internal road (PCC) at Lungphun       200,000 YMA, Lungphun Completed
38 Construction of Urinal shed near IKK Church at W.Phaileng       120,000 VC, W.Phaileng Completed
39 Procurement of Covid-19 Material        500,000 MLA, 2-Dampa Completed
40 Construction of approach road to Tanky (PCC) at Khawrihnim         50,000 MUP, Khawrihnim Completed
41 Covid-19 Relief Assistance    1,679,294 MLA, 2-Dampa Completed
42 Construction of PCC flooring to Middle School at W.Lungdar       150,000 VC, W.Lungdar Completed
43 Construction of Waiting shed at Bawngthah       200,000 VC, Bawngthah Completed
44 Hospital bill         50,870 MLA, 2-Dampa Completed
45 Construction of Masonry step approach towards to MHIP House Pukzing         50,000 MHIP, Pukzing Br. Completed
46 Renovation of Community Hall at Reiek       500,000 YMA, Reiek Completed
47 Construction of Thlanmual In at S.Sabual       200,000 YMA, S. Sabual Completed
48 Construction of Urinal shed near YMA Library Tuahzawl       100,000 YMA, Tuahzawl Completed
49 Construction of Step/PCC flooring near Presbyterian Church Tuahzawl       200,000 MUP, Tuahzawl Br. Completed
50 Construction of Volleyball Court at Khawrihnim       150,000 GSA, Khawrihnim Completed
51 Construction of MHIP Run at Chhipui       200,000 MHIP, Chhippui Br. Completed

LIST OF WORKS UNDER 2-DAMPA (ST) A/C FROM 2020 – 2021 

Sl. No Name of works  Sanction Amount  Executing  Agency Status
1 CM Relief Fund (MLA donation)      2,500,000 MLA, 2-Dampa Completed
2

a) Purchase of Silpaulin

b) Purchase of Material for prevention of Covid-19

c) Purchase of Sports good

        705,603 MLA, 2-Dampa Completed
3 Cinstruction of Volleyball Court at Hreichuk         200,000 VC, Hreichuk Completed
4 Renovation of road between Pukzing to Hnahva         400,000 VC, Pukzing Completed
5 Renovation of road between Hnahva to Silsuri         400,000 VC, Hnahva Completed
6 Construction of PCC flooring from PWD road to Pu Zokhuma peng at W.Lungdar         250,000 YMA. W.Lungdar Completed
7 Construction of Internal road         300,000 VC, Chhippui-I Completed
8 Construction of Urinal shed near UPC Church Ailawng         150,000 GSA, Ailawng Completed
9 Construction of Mualbawm appraoch road at Ailawng         150,000 YMA, Ailawng Completed
10 Construction of Futsal Ground at W.Phaileng         500,000 VC. W.Phaileng Completed
11 Construction of road (PCC) from Community Hall to K.Zathanzauva house at Kanghmun         500,000 VC, Kanghmun Completed
12 Construction of Futsal Ground at Darlung         400,000 YMA, Darlung Completed
13 Construction of PCC flooring at Pi Biaktluangi house to Pi Hmingthari house at Reiek         300,000 VC, Reiek Completed
14 Construction of Venghnuai approach road PCC pavement at Reiek         150,000 VC, Reiek Completed
15 Renovation of Community Hall at Khawrihnim           50,000 YMA, Khawrihnim Completed
16 Renovation of MHIP buiding at Reiek         300,000 MHIP, Reiek Completed
17 Construction of Bathroom (men & women) at Darbuanga Tuikhur at Reiek         300,000 VC, Reiek Completed
18 Construction of Bee hives at Reiek         150,000 VC, Reiek Completed
19 Requirement of fund for furnitures at VC house at Reiek           50,000 VC, Reiek Completed
20 Construction of PCC flooring Farkawn to Rammawii house at Khawrihnim         300,000 VC, Khawrihnim Completed
21 Construction of MHIP house at Kanghmun         350,000 MHIP, Kanghmun Completed
22 Construction of Community Hall at Bawlte         500,000 VC, Bawlte Completed
23 Construction of public Bathroom at Darlung         200,000 YMA, Darlung Completed
24 Purchase of Bench at Lalkula Community Hall Darlung         100,000 YMA, Darlung Completed
25 Construction of PCC approach to Playgorund at S.Sabual         500,000 VC, S.Sabual Completed
26 MHIP house building at S.Sabual         300,000 MHIP, S.Sabual Completed
27 Renovation of Indoor Stadium at New W.Phaileng         200,000 VC, New W.Phaileng Completed
28 Construction of Rest shed at New W.Phaileng         150,000 VC, New W.Phaileng Completed
29 Construction of Futsal Ground at Kanghmun         400,000 VC, Kanghmun Completed
30 Construction of Community Hall Bawngthah         500,000 VC, Bawngthah Completed
31 Construction of Health Clinic Centre at Chungtlang         300,000 MHIP, Chungtlang Completed
32 Construction of MHIP house at Hreichuk         300,000 MHIP, Hreichuk Completed
33 Extension of Middle School class room at W.Lungdar         600,000 VC, W.Lungdar Completed
34 Construction of PCC flooring at W.Lungdar           50,000 VC. W.Lungdar Completed
35 Construction of MUP Toilet at Khawrihnim         500,000 MUP, Khawrihnim Completed

LIST OF WORKS UNDER 2-DAMPA (ST) A/C FROM 2021 – 2022

Sl. No Name of works  Sanction Amount  Executing  Agency Status
1 Covid-19 Relief Assistance      550,900 MLA, 2-Dampa Completed
2 Construction of PCC step approach to Thlanmual at New W.Phaileng      300,000 VC, New W.Phaileng Completed
3 Construction of PCC BRTF road to Presbyterian Church at W.Phaileng      200,000 YMA, New W.Phaileng Completed
4 Purchase of meterials and hiring of JCB & Truck   1,842,083 MLA, 2-Dampa Completed
5 Constraction of Table and Bench at Ailawng H/S      500,000 MLA, 2-Dampa Completed
6 Purchase of 2 nos of tractor for construction of WRC by Awpuii Zau & Saisih Zau society at Phuldungsei & S.Sabual      240,000 MLA, 2-Dampa Completed
7 Construction of irrigation canal/check dam at Reiek      200,000 YMA, Reiek Completed
8 Cosntruction of Futsal ground fencing at Darlung      100,000 VC, Darlung Completed
9 Cosntruction of information building at Darlung      250,000 VC, Darlung Completed
10 Purchase of Covid-19 materials, Silpaulin and PA set with accessories in various village at 2-Dampa      941,600 MLA, 2-Dampa Completed
11 Cosntruction of Futsal ground at Ailawng      350,000 VC, Ailawng Completed
12 Cosntruction of retaining wall at Kawnmawi      200,000 MHIP, Kawnmawi Completed
13 Cosntruction of approach road at Vengchhak at Lallen      200,000 MUP, Lallen Completed
14 Cosntruction of Community Hall at Hruiduk      200,000 VC, Hruiduk Completed
15 Cosntruction of Volleyball court at Pukzing      200,000 VC, Pukzing Completed
16 Construction of Volleyball court at Hnahva      200,000 VC, Hnahva Completed
17 Cosntruction of approach road to Presbyterian Church, Electrict veng W.Phaileng      200,000 VC, W.Phaileng Completed
18 Construction of approach road to Losar at Chhippui-I      200,000 VC, Chhippui-I Completed
19 Construction of Urinal shed at Phuldungsei      200,000 VC, Phuldungsei Completed
20 Cosntruction of Community Hall at Bawngthah      500,000 VC, Bawngthah Completed
21 Construction of approach road (PCC) to H/S at Bawngthah      100,000 VC, Bawngthah Completed
22 Cosntruction of Dwelling house in respect of Pu B.Ramena of W.Phaileng      200,000 MLA, 2-Dampa Completed
23 Cosntruction of Dwelling house in respect of Pi Lalremtluangi of Lallen      120,000 MLA, 2-Dampa Completed
24 Construction of Information Centre at Lianbuang      200,000 VC, Lianbuang Completed
25 Construction of PCC flooring of internal road at Lallen      250,000 VC, Lallen Completed
26 Expenditure inccured towards facilitation programme, Dampa East Block (MNF) held by MLA Award Organizing Committee      100,000 MLA, 2-Dampa Completed
27 Construction of PCC step approach to Thlanmual at W.Phulpui      200,000 VC, W.Phulpui Completed
28 Repairing of road Pukzing to Marlui      250,000 MLA, 2-Dampa Completed
29 For assistance of educational purpose for destitute family        50,000 MLA, 2-Dampa Completed
30 Hospital bill for Pu Thansanga of W.Phulpui        87,500 MLA, 2-Dampa Completed
31 Construction of Internal road (PCC flooring) at Phukzing Vengthar      250,000 VC, Pukzing Vengthar Completed
32 Construction of PCC flooring between Catholic Church to Forest Quarter at Kanghmun      200,000 VC, Kanghmun Completed
33 Construction of PCC flooring near M/S at Saithah      200,000 VC, Saithah Completed
34 Purcchase of materials in connection with Covid-19      350,000 MLA, 2-Dampa Completed
35 Construction of Volleyball court at Marpara Mizoveng      250,000 VC, Marpara Mozoveng Completed
36 Cosntruction of PCC flooring approach road to Lengra veng, Marpara North      300,000 VC, Marapara North Completed
37 Assistance for construction of house in respect of Lalkhumtirra of Pukzing        80,000 MLA, 2-Dampa Completed
38 Construction of PCC flooring between Lengra veng Presbyterian Church to Nihar Bindhu house at Marpara North      200,000 VC, Marpara North Completed
39 Construction of Urinal shed near Kohhran Thianghlim at Khawrihnim      150,000 VC, Khawrihnim Completed
40 Construction of road (PCC flooring) approach to Presbyterian Church at Darlung      200,000 VC, Darlung Completed
41 Completion of information centre building at Darlung      250,000 VC, Darlung Completed
42 Completion of Futsal ground at Kanghmun      200,000 VC, Kanghmun Completed
43 Cosntruction of foothpath railing at Kanghmun      200,000 VC, Kanghmun Completed
44 Cosntruction of MUP building at S.Sabual      300,000 VC, S.Sabual Completed
45 Cosntruction of PCC step at Reiek        50,000 VC, Reiek Completed
46 Construction of Volleyball court at Lungphun      150,000 VC, Lungphun Completed
47 Completion of Futsal ground at Ailawng      150,000 VC, Ailawng Completed
48 Construction of Volleyball court at H/SS at W.Phaileng      250,000 VC, W.Phaileng Completed
49 Cosntruction of approach step to Health Clinic Centre Chungtlang      100,000 VC, Chungtlang Completed
50 Construction of sStep between PWD road to Thankhuma house at S.Sabual      150,000 VC, S.Sabual Completed
51 Construction of approach step to YMA Library at Pukzing      150,000 YMA, Pukzing Completed
52 Construction of PCC flooring near Electrict veng Presbyterian Church at W.Phaileng      150,000 VC, W.Phaileng Completed
53 Construction of Retaining Wall near IKK Biak in at W.Phaileng      150,000 VC. W.Phaileng Completed
54 Purchase of Silpaulin for 2-Dampa by Hon’ble MLA      315,160 MLA, 2-Dampa Completed
55 Construction of approach road to Kaihlet Tuikhur at Tuahzawl      200,000 VC, Tuahzawl Completed
56 Construction of PCC flooringat Thlanmual approach road at Reiek      200,000 YMA, Reiek Completed
57 Construction of PCC flooring from main road to Presbyterian Church      200,000 VC, Rulpuihlim Completed
58 Construction of waithing shed near Sub-Centre      200,000 VC, Rulpuihlim Completed
59 Construction of Thanmual In at Rulpuihlim      100,000 VC, Rulpuihlim Completed
60 Construction of PCC flooring between Pu Chhuankunga house to SP Laldingliana house at Reiek      200,000 VC, Reiek Completed

LIST OF WORKS UNDER 2-DAMPA (ST) A/C FROM 2022 – 2023

Sl. No Name of works  Sanction Amount  Executing  Agency Status
1 Cosntruction of Urinal shed at Hreichuk          150,000 VC, Hreichuk Completed
2 Construction of Urinal Shed near IKK Church at Reiek          200,000 VC, Reiek Completed
3 Construction of Urinal shed near Health Clinic Centre at Chungtlang          150,000 VC, Chungtlang Completed
4 Construction of Zuksih link road at Rulpuihlim          500,000 VC, Rulpuihlim Completed
5 Purchase of materials items of Silpaulin, sports goods and computer set and reneumeration of Teacher & Health Worker       1,052,816 MLA, 2-Dampa Completed
6 Construction of PCC flooring from Rosema house to Somla house at Pukzing Vengthar          150,000 VC, Pukzing Vengthar Completed
7 Construction of PCC flooring at Motendro Chakma house to Lengra Bridge at Marpara North          300,000 VC, Marpara North Completed
8 Construction of retaining wall at New W.Phaileng          150,000 VC, New W.Phaileng Completed
9 Construction of Step near Imanuel Baptist Church at New W.Phaileng          150,000 VC, New W.Phaileng Completed
10 Construction of footstep approach to Chatui veng at Phuldungsei          100,000 VC, Phuldungsei Completed
11 Repairing of Two MHIP building at W.Lungdar          200,000 MHIP, W.Lungdar Completed
12 Construction of footstep approach to P/S-III and Thlanmual at Phuldungsei          100,000 VC, Phuldungsei Completed
13 Construction of Waiting shed at Lungphun kawn Phuldungsei          100,000 VC, Phuldungsei Completed
14 Construction of Urinal shed near Phulbial Community Hall at Phuldungsei          150,000 VC, Phuldungsei Completed
15 Construction of Jepable road near Kohhran Thianghlim Church at Phudungsei          150,000 VC, Phuldungsei Completed
16 Construction of Step from PWD road to Indra Sen house at Hruiduk          150,000 VC, Hruiduk Completed
17 Construction of PCC flooring approach to UPS at Bawlte          200,000 VC, Bawlte Completed
18 Construction of Footpath railing at Pukzing            50,000 VC, Pukzing Completed
19 Construction of Retaining wall near BCM Church at Lallen          150,000 VC, Lallen Completed
20 Construction of YMA Store Room at Bawlte          100,000 YMA, Bawlte 2nd Instalment not yet release
21 Construction of PCC flooring near IKK Church at Venghlun W.Phaileng          150,000 VC, W.Phaileng Completed
22 Purchase of Materials, construction of House and fecilitation of outstanding St within W.Phaileng RD Block          634,422 MLA, 2-Dampa Completed
23 Construction of road (PCC flooring) between Catholic Church to Tanky at Kanghmun          200,000 VC, Kanghmun Completed
24 Construction of MHIP house at Khawrihnim          250,000 VC, Khawrihnim Completed
25 Construction of Football field at Darlung          500,000 VC, Darlung Completed
26 Repairing of MHIP Quarter at Darlung          100,000 MHIP, Darlung Completed
27 Extension & repairing of Volleyball court Rulpuihlim          120,000 VC, Rulpuihlim Completed
28 Construction of Community Hall at Chungtlang          500,000 VC, Chungtlang Completed
29 Construction of Masonry drainage near Pi Zalianthangi house at Reiek          100,000 VC, Reiek Completed
30 Construction of MHIP building at Bawngthah  2,50,000  MHIP, Bawngthah 2nd Instalment not yet release
31 Construction of footstep (PCC) at Halelui veng at W. Phaileng          100,000 GSA W. Phaileng Completed
32 Reimburesment of MLA Fund          220,650 MLA, 2-Dampa Completed
33 Construction of Retaining Wall near UPC (Mizoram) at W. Phaileng          150,000 VC W. Phaileng Completed
34 Construction of Volleyball Court at Chhippui          200,000 GSA Chhippui Completed
35 Construction of store room at Lallen Graveyard            50,000 YMA Lallen Completed
36 Construction of MUP House at Lallen          100,000 MUP Lallen Completed
37 Reimburesment of Expenditure bill by MLA          439,750 MLA, 2-Dampa Completed
38 Reimburesment of Expenditure bill by MLA          165,580 MLA, 2-Dampa Completed
39 Reimburesment of Expenditure bill by MLA            90,000 MLA, 2-Dampa Completed
40 Construction of PCC Step between PWD Road to Edenthara house at Hreichuk          100,000 VC Hreichuk Completed
41 Construction of Internal Link road between Kanan veng Information to Tuipuibari road at W. Phaileng          400,000 VC W. Phaileng Completed
42 Road clearing of landslide debris between Mauchikkawn to Tut river at W. Phaileng          100,000 VC W. Phaileng Completed
43 Continouation for construction of Community Hall at Chungtlang          500,000 VC Chungtlang Completed
44 Construction of approach step to Volleyball Court at Chungtlang            50,000 VC Chungtlang Completed
45 Construction of Side drain between Health Sub-Centre to Filed at Hreichuk          200,000 VC Hreichuk Completed
46 Construction of YMA Library at Parvatui          400,000 YMA Parvatui 2nd Instalment not yet release
47 Construction of Internal road (PCC) to Tuikhur veng at Parvatui          150,000 YMA Parvatui 2nd Instalment not yet release
48 Construction of PCC flooring between Sombi Chakma house to Krisno Chakma house at Marpara North          250,000 VC Marpara North Completed
49 Construction of Step between Zawlveng to Mar river at Marpara Mizoveng          150,000 VC Marpara Mizoveng Completed
50 Construction of Urinal Shed near Supply Godown at Marpara Mizoveng          150,000 VC Marpara Mizoveng Completed
51 Construction of Drain and Culvert at Bawkveng kawn Lungphun           150,000 YMA Lungphun Completed
52 Construction of Drain from PWD road to Chawithanga House site at Tuahzawl          300,000 VC Tuahzawl Completed
53 For expenditure of livelihood for 3 destitute persons by MLA          300,000 MLA, 2-Dampa Completed
54 Reimbusement of expenditure bill (Purchase of Hearing Aid for 2 persons) by MLA            56,600 MLA, 2-Dampa Completed
55 Construction of MHIP Building at W. Phaileng          300,000 MHIP W. Phaileng 2nd Instalment not yet release
56 Construction of road between Field to Kangfim at South Sabual          150,000 VC South Sabual 2nd Instalment not yet release
57 Construction of approach step near Bawlte Biak-In at Bawlte          280,000 VC Bawlte 2nd Instalment not yet release
58 Construction of Truckable road between High School to Electric Transformer at W. Lungdar          100,000 VC W. Lungdar Completed
59 Expenditure of 4 destitute family          470,500 MLA, 2-Dampa Completed
60 Construction of MHIP Building at Chungtlang          250,000 MHIP Chungtlang 2nd Instalment not yet release
61 Reimburesment of Expenditure bill for Sport activities anf reapairing of house for 12 persons          124,840 MLA, 2-Dampa Completed
62 Construction of YMA Building at Kawnmawi          150,000 YMA Kawnmawi 2nd Instalment not yet release
63 Construction of Step approach to Presbyterian Church at Lungphun          150,000 MUP Lungphun Completed
64 Construction of PCC flooring betwee YCA Fish pond to Gyana house at Silsury West          300,000 VC Silsury West 2nd Instalment not yet release
65 Renovation of Tawna Hall at W. Phaileng          100,000 VC W. Phaileng 2nd Instalment not yet release
66 Repairing of Football Playground at Reiek            50,000 GSA, Reiek 2nd Instalment not yet release
67 Reimburse of MLA Fund by MLA          736,000 MLA, 2-Dampa Completed